Project Engineer and construction manager for the installation of a generator on the roof of a high-rise building in center-city Philadelphia. This project included:  300kW generator for life safety and 18 elevators. Control system to handle regenerative power from elevator drives. Four helicopter lifts to install generator on the roof. Coordination with the city to close 10 square blocks to vehicular and pedestrian traffic. Integrated testing, commissioning services.
Exterior of a building with blue and white accents, featuring the
21 May 2021
Project Engineer for numerous record storage facilities in the US, including: Over 3,500,000 SF of record storage space over 75 facilities. 
Paradigm Consulting Engineers logo: light gray text and logo on white background.
21 May 2021
Project Engineer for new paper record storage facility. This project included:  275,000 SF of record storage
Logo for Paradigm Consulting Engineers: blue and white text with a design and the company name.
21 May 2021
Project Engineer for learning center on 31st floor of Plaza Center in NY. This project included:  41,000 SF learning center.
Blue generator on a metal frame, against a white background.
21 May 2021
Project Engineer for data center/lab space and office. This project included:  600kW/750kVA diesel generator. Two 120kVA UPS Systems. 2,000 SF of raised floor space. 90,000 SF Class A office space.
A two-story brick building with trees in autumn; a parking lot and street in front.
21 May 2021
Project Engineer for office space. This project included:  32,000 SF Class A office space.
Logo for Paradigm Consulting Engineers: blue and white text with a design and the company name.
21 May 2021
Project Engineer for new data center. This project included:  3,500 SF raised floor space
Two people walking in a data center filled with server racks.
21 May 2021
Project Engineer for data center/satellite site. This project included: Two 750kW/1000kVA diesel generators, N+N Two 300kVA UPS systems, N+N 1,200 SF of raised floor space Coordination, short-circuit, and arc flash study