Institutional

Red brick building with clock tower under a cloudy sky, set on a grassy field.
21 May 2021
Project Engineer for this new institutional laundry facility. This project included:  Nine 125 lb industrial clothes washers Nine 550 MBH natural-gas fired clothes dryers Two 1100 MBH hot-water boilers New 3,500 SF building
Pope John Paul II High School with a statue of the Pope and a large cross in front.
21 May 2021
Project Engineer for new elementary school. This project included:  90,000 SF of institutional space.
Large stone building on a green field under a clear blue sky.
21 May 2021
Project Engineer for renovation of student center. This project included:  Complete electrical renovation for 130,000 SF university owned student center. Coordination, short-circuit, and arc flash study for 15kV, 5kV, and low-voltage equipment. Component testing, integrated testing, commissioning services.
A large stone building with a green field in front of it, under a blue sky.
21 May 2021
Project Engineer for renovation of apartment building. This project included:  50 apartments within 55,000 SF of a university owned apartment building.
Stone building with American flag on a clear day.
21 May 2021
Project Engineer for new charter school. This project included:  50,000 SF of institutional space.