Project Engineer for feasibility study for new main substation to support pharmaceutical campus expansion. This project included:


  • 69kV-12.47kV substation layout
  • Two 43MVA transformers with load-tap changers.
  • Double-ended 15kV switchgear in PDC.
  • 12.47kV site distribution feeding over 20 buildings.
  • Future 5MW co-generation plant.
  • Options for indoor 138kV Gas-Insulated Switchgear (GIS) and outdoor 138kV with ring bus configuration.
Paradigm Consulting Engineers logo: light gray text and logo on white background.
21 May 2021
Project Engineer for new electrical service for 290,000 SF, 16-story high rise in center city Wilmington. This project included:  Two 15kV electric services. Main-tie-main 15kV switchgear lineup with auto-transfer capability. 1500kVA pad-mounted transformer. 3000A low-voltage switchgear for building service/distribution. Coordination, short-circuit, and arc flash study. Component testing, integrated testing, commissioning services.
Logo for Paradigm Consulting Engineers: blue and white text with a design and the company name.
21 May 2021
Project Engineer for the 13.2kV electrical distribution and emergency generation for this new 120-acre campus with 350,000 SF of institutional space. This project included: Six electric manholes with separable connectors, junctions, and fusing. Five 1500kVA pad-mounted transformers. Two 500kVA submersible transformers. Three 400kW diesel generators. 
Logo for Paradigm Consulting Engineers: blue and white text with a design and the company name.
21 May 2021
Project Engineer for construction of transformer vault/switchgear building, and interconnection with utility company. This project included: Three 27kV electric services (one aerial and two underground, approximately 3,000 feet each. Three 2000kVA network transformers. Three 4000A network protectors. 4000A – 480/277V switchgear; main-tie-main-tie-main. De-commissioning of 7MW prime-power diesel generator 