B31 Substation Project included:

  • Main-generator-tie-generator-main switchgear/unit substation with auto-transfer system, and closed-transition generator synchronizing, paralleling, and load control system.
  • 1000kW diesel generator.
  • 480V distribution to all critical site utility systems (clean steam, water-for-injection (WFI) etc.).
  • Water treatment plant for WFI
  • Component testing, integrated testing, commissioning services.
Paradigm Consulting Engineers logo: light gray text and logo on white background.
21 May 2021
Project Engineer for new electrical service for 290,000 SF, 16-story high rise in center city Wilmington. This project included:  Two 15kV electric services. Main-tie-main 15kV switchgear lineup with auto-transfer capability. 1500kVA pad-mounted transformer. 3000A low-voltage switchgear for building service/distribution. Coordination, short-circuit, and arc flash study. Component testing, integrated testing, commissioning services.
Logo for Paradigm Consulting Engineers: blue and white text with a design and the company name.
21 May 2021
Project Engineer for the 13.2kV electrical distribution and emergency generation for this new 120-acre campus with 350,000 SF of institutional space. This project included: Six electric manholes with separable connectors, junctions, and fusing. Five 1500kVA pad-mounted transformers. Two 500kVA submersible transformers. Three 400kW diesel generators. 
Logo for Paradigm Consulting Engineers: blue and white text with a design and the company name.
21 May 2021
Project Engineer for construction of transformer vault/switchgear building, and interconnection with utility company. This project included: Three 27kV electric services (one aerial and two underground, approximately 3,000 feet each. Three 2000kVA network transformers. Three 4000A network protectors. 4000A – 480/277V switchgear; main-tie-main-tie-main. De-commissioning of 7MW prime-power diesel generator 